Featured Projects

WE’RE CREATIVE

WE’RE PASSIONATE

WE’RE THE SOLUTION

Projects designed to get results

Facility Projects

project 4

TRIMBLENDER FEED

The Trimblender scope for Keyera Corp. included designing a green field infrastructure which allowed for the injection of condensate and butane into a High Viscosity Dilbit pipeline with associated blending, custody transfer metering and quality control equipment. The Trimblender was designed so that the new infrastructure would target 100% availability and reliability. Learn more >

project 3

MODULAR SEVERE SERVICE PRESSURE LETDOWN STATIONS

Tridyne was retained to provide a repeatable modular design for two configurations (Horizontal & Vertical) on High Pressure (2500# ANSI), High Temperature (408°C) Refinery letdown skids. In addition to the initial design, Tridyne is in the design phase to produce 5 stations for a Refinery in India. Learn more >

project 2

DILUENT RECOVERY UNIT PROJECT

The Diluent Recovery Unit Project provides storage and transfer capability to support the proposed Diluent Recovery Unit (DRU) near the Gibson Hardisty Terminal (GHT) located near Hardisty, Alberta. Learn more >

project 10

SOUTH TAYLOR TRD

This project consisted of a green field design and construction of a new Treatment Recovery and Disposal plant that included site civil development, truck unloading and metering of heavy oil and water, value added solid and liquid waste processing & storage.                 Learn more >

project 5

HIGHWAY TRUCK LOADING PROJECT

This project included the installation of two new pipelines from a proposed new facility to an existing Treatment Recovery and Disposal (TRD) facility. The distance from the Highway Terminal to the existing TRD is ≈ 7.5 kilometers. Learn more >

project 6

STOUGHTON RAIL LOADING STATION

Crescent Point required the installation of rail truck loading equipment at their site which included the construction of a new single spur approximately 700 feet in length, along with installation of eight (8) dual sided loading stations that allow loading on both existing and proposed tracks with maximum loading capacity. Learn more >

project 9

VALHALLA SOUR GAS PLANT EXPANSION

Kanata Energy Group Ltd. commissioned Tridyne Projects to full EPCM for the expansion of the existing Valhalla gas plant located at 13-21-76-09-W6M from a current throughput of 12mmscfd to 45mmscfd. Learn more >

project 8

BUCK CREEK TRD

This project included the green field design and construction of a new Treatment, Recovery and Disposal (TRD) facility for Tervita Buck Creek property. The facility was designed to receive heavy clean oil, light clean oil and condensate feeds via truck and blend continuously to the Pembina LACT unit. Design blending rates were for 520 m3/day. Learn more >

project 7

VIEWFIELD RAIL LOADING FACILITY

Constructed a facility to load C3, C4, and C5 via pipelines from the Viewfield gas plant. In addition, there would be at least one crude oil line connected to the facility. A full-scale truck rack was connected at the rail facility. Learn more >

project 1

MOOSE JAW REFINERY EXPANSION FEED

The scope of the project included the addition of a 4700 BPD Combined Gas Oil Separation Unit into the Gibson Energy Moose Jaw Facility located in the city of Moose Jaw, Saskatchewan. Learn more >

Pipeline Projects

1-2

MWH PIPELINE

Cenovus Energy retained Tridyne Projects Corporation to provide engineering, procurement, regulatory and construction support for the installation of a new pipeline system and facility tie-ins as part of the brackish water supply expansion. The project included the repurpose and reversal of an existing disposal pipeline, 3.8km of new pipeline, etc. Learn more >

DCIM100MEDIADJI_0001.JPG

LA GLACE TO WAPITI PIPELINE EXPANSION

Pembina Pipeline Corporation (Pembina) retained Tridyne to provide engineering, procurement, and construction support for the installation of a new pipeline system and facility tie-ins as part of the Phase VI upgrades for the La Glace to Wapiti pipeline expansion.     Learn more >

3-2

STONY BEACH PIPELINE HDD REPLACEMENT

Gibson retained Tridyne to provide engineering, procurement, and construction management for the installation of a new NPS 8 pipeline crossing of Moose Jaw River, complete with tie-ins to the existing Stony Beach Pipeline as part of an integrity management program. Learn more >

4-3

SALES GAS PIPLINE

TAQA North (TAQA) retained Tridyne Projects Corporation to provide engineering, procurement, regulatory support and construction support for the installation of a new pipeline system. This new system includes a 16km NPS 12 pipeline which connected TAQA’s existing gas plant to TC Energy’s tie-in.  Learn more >

Chiese 2

O'CHIESE PIPELINE

TAQA North (TAQA) retained Tridyne Projects Corporation to provide engineering, procurement, regulatory support and construction support for the installation of a new pipeline system and facility tie-ins. The new pipeline system includes a 5km NPS 10 pipeline which connected TAQA’s existing facility to a new site. Learn more >

6-2

TRUNK LINK EXTENSION PIPELINE

TAQA North retained Tridyne to provide engineering, procurement, regulatory support and construction support for the installation of a new pipeline system and facility tie-ins. The new pipeline system includes a 12km pipeline, connecting TAQA’s existing facility site to a new site. Learn more >

7-4

O'CHIESE EXTENSION PIPELINE

TAQA North (TAQA) retained Tridyne to provide engineering, procurement, regulatory support and construction support for the installation of a new pipeline system and facility tie-ins. The new pipeline system includes a 3km pipeline which extends TAQA’s existing pipeline to a new site. Learn more >